Bosnia And Herzegovina - Mining Production

Edit mode
Bosnia And Herzegovina Latest Reference
Mining Production
GDP From Mining

Mining Production in Bosnia And Herzegovina fell to -5.40 percent from 6.90 percent and GDP From Mining went down to 128493.00 BAM Thousand from 147241.00 BAM Thousand in Q4 2015.

Mining Production all-time average stands at 2.60 percent and it's projection for Jun 2018 is 3.97. GDP From Mining averaged 131431.30 BAM Thousand and is projected to be 136417.41 in Q2 2016.